STOCK REMOVAL CYCLE ( CYCLE 95 )



ABBREVITATION                        CYCLE 95 MEANING                                            
  1.    NPP = HARSH                        Sub-routine programme name                            
  2.    MID =  0.2                               Depth of cut each turning cut                                   
  3.    FALZ = 0.1                              Finishing allowance for z- axis                              
  4.    FALX = 0.1                              Finishing allowance for x-axis                                  
  5.    FAL =  0.1                                Finishing allowance for radius or arc surface           
  6.    FF1 =  200                                Feed rate for rough cuts in mm/revolution               
  7.    FF2 =  300                                Feed rate for taking depth of cut while ins-                                                                                     ertion in into job                                                         
  8.    FF3 = 200                                Feed rate for list finishing cut to remove fi-                                                                                     nishing allowance                                        
  9.    VARY = Int=11                        Machining type (1 to 12) any required no.                                               = Ext=9                         by pressing select key                                  
  10.    DT  = __                                   Dwell time for chip breaking in given                                                                                             time only rough cut 
  11.    DAM = __                               Path length for chip breaking after which                   
  12.                                                     length chip breaks .                         
  13.    VRT = __                                 Tool relive distance after completed data                                                                                          each turning cut .
STOCK REMOVAL CYCLE ( CYCLE 95 ) STOCK REMOVAL CYCLE ( CYCLE 95 ) Reviewed by HARSHAL DHAWAS on October 02, 2017 Rating: 5
Powered by Blogger.